Is my lot a fit?
Is there money behind your house? Six questions, two minutes.
Pick the closest answer for each. The form does not store anything and nobody sees it but you.
Why these six
They are the same things we check first.
- Size
- Each new home site needs roughly 2,200 square feet including a share of the drive, and the house keeps the land it uses. Below about 8,000 square feet the arithmetic rarely works.
- Position
- A house near the street leaves the back open. A house in the middle can still work if a side is wide enough.
- Access
- Fire trucks need a 20-foot path. Street frontage or a wide driveway is the simplest; sometimes a recorded easement exists that the map does not show.
- Slope
- Gentle slopes are fine. Steep ground costs more to build on than the land is worth.
- Associations
- An association's rules apply even where the city would say yes, and they almost always say no.
- Zones
- In a very high fire hazard area the faster city process does not apply. Inside the coastal zone an extra permit applies and the process is slower, and we still look at those lots. We check the exact parcel on the state maps.
Not sure about any of these? Send us the address anyway. Ten minutes with the county's map open settles all six.